This will be the view from just in front of the Ignite Buildng (grades 7-12) looking at the main entrance from Greenwood Road.

This view is of the proposed design for the interior of the coffee foyer. The existing structure will be opened up so that the ceiling is higher, and provides natural light.

This picture shows the rough drawing of phase 1, which will start in November 2016 and should be completed in Summer 2017.

A more straight-on view of the new unified front design to the building.

This picture represents the proposed master plan for Greenwood’s future buildings, and parking lots. We do not currently have a time-table on when the new Worship Center (Phase 2) will be constructed. Phase 1, the children’s space and reconfiguration of offices, will begin in November of 2016.